Description:
Project:
Construction and commissioning of the 70 kV Sanga-Ngombe Matadi HV line and the 70/30/15 kV – 7MVA substation at Ngombe Matadi are being carried out by Contractor the Ray Group Electromechanical.
Consistency of the work
- Construction of a 70 kV line feeder unit at the NSANDA source substation.
These works consist of the supply, assembly and commissioning of electromechanical equipment HV 70kV
-
- A line disconnector with MALT
- A busbar disconnector
- A 70kV HV circuit breaker
- Three (3) Voltage transformer
- Three (3) Current transformer
- Three (3) line surge arrester
- Supply and assembly of structures and electrical framework
-
- Including civil works and earthing.
- Construction of a 70kV Nsanda- Gombe Matadi line 35 km long.
This work consists of:
-
- Build the foundations of the pylons
- Pylons erection
- Addition of missing angles in the pylons
- Pulling of the 70kV line
- Construction of the 70/30 / 15kV- 7 MVA GOMBE MATADI transformer station.
This work consists of:
-
- Construction of a 70 kV incoming bay of the Nsanda substation
- Construction of a transformer protection bay
- Rehabilitation and maintenance of the 70/30 / 15kV- 7 MVA transformer
Mounting of the following electromechanical equipment;
- Mounting of one (1) 70kV HV circuit breaker
- Mounting of one (1) head-of-line disconnector
- Mounting of one (1) busbar disconnector
- Mounting of the 6 current transformers
- Mounting of the 6 voltage transformers
- Mounting of 6 70kV surge arresters
-
- Civil engineering works and earth network of equipment
- Construction of a control building and two houses of SNEL operators
- Installation of the exterior lighting of the substation