Description:

Supply procurement for the installation of the Sanga-Ngombe Matadi 70KV line and the Ngombe Matadi 70/30/15KV – 7 MVA substation and electrification of Ngombe Matadi and Nkamba.

 

  • Construction of a 70 kV HV line – NSANGA – GOMBE MATADI in Central Congo.

 

  • The supply of 126 km of ASTER 117 mm² conductor for the 70 kV Sanga – Ngambe Matadi line;
  • the supply of 42 km of the guard conductor OPGW 110 mm²

 

  • Substation 70/30/15- 7MVA- GOMBE MATADI

 

  • Supply of electromechanical HV- 70kV equipments for incoming protection of the 70 kV Zanga line in the Ngombe Matadi substation;
  • Supply of HV-70kV electromechanical equipment for the outgoing protection of the 70 kV Nsanga – Gombe matadi line at the NSANDA substation;
  • supply of protection cabinets, MV switgear 30 and 15 kV and auxiliary for the GOMBE MATADI substation

 

  • Establishment of the NKAMBA and GOMBE MATADI distribution network
  • supply and installation of 2.5 km of line 15 kV for the Ngambe Matadi MT distribution network;
  •  the supply and mounting of the Sub station 15 / 0.4kV – 250kVA and connection of LV subscribers at Gombe – Matadi;
  •  the supply and assembly of 4 km of three-phase and single-phase LV lines in LV Alu tarsades 3x70mm 2 + 54.6mm2 cables for the distribution, LV cables in Alu 3x35mm2 + 54.6mm2 for the connection secondary  and 4x16mm2 Alu twisted for the three-phase connections and 2x16mm2 for the single-phase connections mounting sure the supports in wood processed ;

 

  • the supply and assembly of 18 km of 30 kV line of 50 mm2 ACSR for the Gombe Matadi – Nkamba line;
  • he supply and mounting of the Substation 30/ 0.4kV – 250kVA and connection of LV subscribers at NKAMBA;
  • supply and assembly of 4 km of 30 kV line of 50 mm2 ACSR for the MV distribution network of Nkamba;
  • supply and assembly of 8,620 km of LV lines in Alu twisted cable 3x70mm 2 + 54.6mm2 for the distribution and 1.5 km of cable and 4x16mm2 Alu twisted for the three-phase connections and 2x16mm2 for the single-phase connections mounting sure the supports in wood processed to the City NKAMBA;

 

 

Funding: AFDB

Region: DRC, Central Congo

Date: 2014-2015