Description:
220kV span extension project, Assembly of 220KV substation equipment in Kimwenza, on behalf of the World
Bank / SNEL-ABB / RAY GROUP;
Study, supply and design of civil engineering plans and foundations of the various MV electromechanical
equipment of the Substation.
Civil engineering
• Construction of the HTA equipment foundation ;
• Construction of drainage channels ;
• Assembly of metallic structures for MV and portal equipment.
Electromechanical
• Assembly of electromechanical equipment HTB, HTA ;
• Realization of earth network
• Connection of station equipment,
• Installation of the static compensator,
• Wiring, testing and commissioning of the substation.