Description:

 220kV span extension project, Assembly of 220KV substation equipment in Kimwenza, on behalf of the World 

     Bank / SNEL-ABB / RAY GROUP;

     Study, supply and design of civil engineering plans and foundations of the various MV electromechanical 

     equipment of the Substation.

 

Civil engineering

      •     Construction of the HTA equipment foundation ;
      •     Construction of drainage channels ;
      •     Assembly of metallic structures for MV and portal equipment.

 

  Electromechanical

•    Assembly of electromechanical equipment HTB, HTA ;
•    Realization of earth network
•    Connection of station equipment,
•    Installation of the static compensator,
•    Wiring, testing and commissioning of the substation.

Funding: World Bank

Region: Kinshasa

Date: 2012 – 2013