Description:
Pole installation works, construction of transformer substations and reinforcement of the power transmission line of Boma-Tshela and the 30kv MV Moenge substation for the electrification of multiservice platforms in Lukula and Tshela.
Civil engineering
- Study, supply and design of civil engineering plans and foundations of various electromechanical equipment HTB, HTA
- Study and design of the bases of MV, LV poles,
- Studies, supply and assembly of MV mechanical structures ;
- Construction of the Lunga Vasa disconnection station and includes:
• Construction of the foundation of equipment and column bases
- Construction of the new Moenge substation includes:
• Construction of the foundation of equipment and column bases;
• Construction of the substation control building.
- Electrification of Lukula and Tshela
• Foundation construction of two 30 / 0.4 kV – 630 kVA distribution cabins
• Foundation construction, column bases
Electromechanical
- Construction of the Lunga Vasa disconnection station and includes
• A 132 kV withdrawal bay;
• A control command kiosk
• Installation of the AC and DC services of the disconnection station,
• Wiring, testing and commissioning of the substation.
• Connection of station equipment,
- Construction of the new Moenge substation includes:
• One bay on the Lunga-Vasa-Moenge line,
• A busbar,
• A 132/30 / kV – 10 MVA power transformer,
• Installation of the substation’s AC and DC auxiliary services.
• Wiring, testing and commissioning of the substation.
• Connection of station equipment, - Electrification of Lukula and Tshela
• Installation of two 30 / 0.4 kV – 630 kVA distribution cabins
• Installation of a new 400 m MV / LV line supplying the Lukula cabin
• Connection of the existing 64 km Boma-Tshela MV line to Moenge substation
• Wiring, testing and commissioning of the substation.
• Connection of equipment,